Xixian International Culture and Education Park Shantytown Reconstruction (Phase I) Special Transformer Power Supply and Distribution Project
Project Overview: Fengjingyuan Community is a special transformer power supply and distribution project for shantytown renovation (Phase I) of Xixian International Culture and Education Park. The project is located on Culture and Education Road 1 of Xixian International Culture and Education Park, surrounded by planned roads, with a total land area of about 133 mu and an overall planned total construction area (including underground) of about 400000 square meters.
This project includes the equipment within the construction scope and its installation, commissioning, test, acceptance and power transmission operation. It is mainly divided into three units. Its Secondary specialized school to 10KV external line project: a new cable is sent from 110kV fishing platform to 10KV bus at intervals in Xicheng New District to the new ring network unit (cultural tourism ring network unit), with a total capacity of 6400KVA and a total length of 5.8km outside line construction, in order to reduce the cost, the line of 1.33km unplanned municipal trench is powered by overhead line. Underground garage section a (north district) special transformer, public transformer and power distribution system project: 2 1600KVA transformers, 1 810KW diesel generator set, 8 high-voltage complete switch cabinets, 30 low-voltage open cabinets, GZDW-65Ah/220V DC screens, low-voltage background monitoring system, public transformer cable system.
The underground garage section B (southern district) special transformer and public transformer power distribution system project: 2 1600kVA transformers, 1 810kW diesel generator set, 4 high-voltage complete switch cabinets, 37 low-voltage open cabinets, 1 DC screen GZDW-65Ah/220V, low-voltage background monitoring system and public transformer cable system. The model of the low-voltage cabinet originally designed in the drawing is GCS, which was changed to Schneider brand cabinet BLOCKSET cabinet after on-site investigation by Party A, design institute and other units and combined with the actual situation of the project. The project will be fully electrified by the end of 2018 and will pass the one-time acceptance.

Related cases